Follow Us

January 15, 2015

The Final result two very happy customers now they can progress onto their next job .. many thanks for the work .

 

January 15, 2015

A good load of items needed to be removed so the gang got too work thankfully we have a sliding roof which enabled us to crush it down as these were well made and needed some crushing..

 

January 2, 2015

One of the cardiff waste vans after working at a cardiff property collecting a full van of waste, clearance completed with 3 van loads  and below another arrival of the other van 

 

January 2, 2015

One of the other waste vans arriving from a cardiff clearance

 

Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Search By Tags
Featured Posts
Please reload

This site was designed with the
.com
website builder. Create your website today.
Start Now